Major challenges for engineering technical leaders
Every software plan runs into the same handful of questions. How do you break the work down? How do you estimate something nobody has built before? How do you stop the scope from growing? This page lists fifteen of those problems, each with a short definition and three ways to solve it, so you can pick the one that fits your team.
Last updated · about 20 minutes
1. How do you decompose a project correctly?
The problem. A project arrives as one big sentence, such as "build a customer portal". Until it is broken into pieces small enough to estimate and assign, nobody can say how long it takes, and the pieces that are missing only show up halfway through the build.
- Top down, all the way to development tasks. Start from the deliverable and split each level into its parts until every leaf is a task one person can finish in one to five days. Follow the 100% rule: the children of a node cover all of its work and nothing more.
- Brainstorm with the team. Ask everyone who will do the work to write tasks down on their own first, then group them into a tree together. The people closest to the code find the work a single planner forgets, such as migrations, environments and test data.
- Visualize the goal. Picture the finished product in use, or sketch its screens and its architecture, and list every part you can see. Each screen, service and integration becomes a branch, and anything you cannot draw is a sign the goal is not clear yet.
2. How do you estimate work nobody has done before?
The problem. New technology, a new domain or a new team leaves no history to compare with. A single number feels like a guess, and it usually is one, so it is either padded until it means nothing or cut until it cannot be met.
- Break it down until it is familiar. An unknown feature is usually a few unknown parts and many ordinary ones. Split it until most leaves look like work the team has done before, and isolate the parts that are truly new.
- Use a three-point estimate. Give each uncertain task an optimistic, a likely and a pessimistic value, then combine them as (O + 4L + P) / 6. The spread between O and P tells the sponsor where the risk sits, which a single number never does.
- Run a time-boxed spike. Spend one or two days building a throwaway prototype of the riskiest part. The estimate that follows is based on something the team has touched rather than on what it imagines.
3. How do you keep the scope from growing?
The problem. Small requests arrive one at a time, each too small to argue about. Together they add weeks of work that nobody planned, while the deadline and the budget stay exactly where they were.
- Baseline the WBS. Agree on the breakdown before the build and keep a copy of it. Anything that is not in the tree is new scope by definition, which turns a vague argument into a simple question: which branch does this belong to?
- Rank everything with MoSCoW. Mark every item as must, should, could or won't. A new request has to take a place in that ranking, and whatever falls below the line of what fits in the time is visibly out.
- Swap, do not add. Accept a change only in exchange for an item of the same size that has not been started yet. The total stays the same, and the customer still gets the flexibility to change their mind.
4. How do you plan dependencies and the critical path?
The problem. Tasks look independent in a list, but the backend has to exist before the frontend can be tested, and the test environment before either can be released. A plan without links shows a date that cannot happen.
- Link the leaves, not the branches. Connect individual tasks with finish-to-start or start-to-start links and a lag where needed. The Gantt chart then shows the real order of work, and the longest chain of linked tasks is your critical path.
- Do the risky integration first. Schedule the tasks on the critical path and the hardest integration as early as possible. A delay found in the first weeks costs a little, and the same delay found in the last week costs the release date.
- Decouple with contracts. Agree on the API first and let each side build against a mock of the other. Two teams that would wait for each other can then work in parallel, and the link becomes one integration task at the end.
5. How do you keep the plan current once work starts?
The problem. A plan is accurate on the day it is written and older every day after. If nobody updates it, the team stops reading it, and the sponsor keeps reading a schedule that no longer describes the project.
- Track progress on the leaves. Record percent complete on tasks only and let every parent roll it up weighted by work. A finished ten-day task then counts ten times as much as a finished one-day task, and the total reflects what is really done.
- Re-forecast every iteration. At the end of each sprint or week, compare the work finished with the work planned and move the remaining dates to match. A small correction every two weeks is easier to accept than one big surprise at the end.
- Keep one plan for everyone. Use the same tree for the team's tasks and the sponsor's timeline, with the Gantt chart drawn from the same rows. When there is only one plan, updating it is part of the work rather than a report written on the side.
6. How deep should the WBS go?
The problem. Too shallow and every leaf is a guess the size of a month. Too deep and the plan turns into a list of hundreds of tiny steps that nobody keeps up to date, and that is out of date before the first one is done.
- Use the 8/80 rule. Stop splitting when a leaf takes between one and ten working days, roughly 8 to 80 hours. Anything larger hides work, and anything smaller belongs in the developer's own to-do list.
- Stop when one person can own it. A leaf is deep enough when it has one owner, a clear definition of done and an estimate the owner is willing to stand behind. Going further adds rows without adding certainty.
- Go deep near, shallow far. Plan the next few weeks in detail and leave later phases as larger blocks. Split them when they come closer and you know more, which is called rolling wave planning.
7. How do you account for work that is not coding?
The problem. Estimates are usually made for writing the code. Code review, testing, deployment, documentation and meetings are left out, and together they can take as much time as the coding itself.
- Give them their own branches. Add explicit branches for testing, environments, release and documentation. Work that has a row in the tree gets an estimate, and work that has no row gets done for free in overtime.
- Add a measured overhead. Look at past projects and find what share of the time went to non-coding work. Apply that percentage to the coding estimate instead of assuming it is zero.
- Put it in the definition of done. Make review, tests and docs part of what "done" means for every leaf. The estimate for each task then has to include them, and nobody can mark a task finished without them.
8. How do you split the work between several teams?
The problem. When several teams share one project, the work falls between them. Each team plans its own part, nobody plans the joins, and the integration at the end takes longer than anything else.
- Split by feature, not by layer. Give each team a whole slice of the product, from the screen down to the database. A team that owns a feature end to end needs far fewer handovers than a frontend team waiting on a backend team.
- One owner per branch. Assign every top-level branch of the WBS to exactly one team. Shared branches become nobody's branches, and the work in them is the work that slips.
- Plan integration as milestones. Put regular integration points on the timeline where all teams deliver together. Problems between teams then surface every few weeks instead of all at once at the end.
9. How do you plan for technical debt and refactoring?
The problem. Refactoring never looks as urgent as a new feature, so it never makes it into the plan. The code gets slower to change every month, and every estimate quietly gets larger.
- Reserve a share of capacity. Set aside a fixed part of every sprint, often 15 to 20 percent, for maintenance and refactoring. It does not have to be negotiated each time, and the debt stops growing.
- Refactor where you build. Include cleanup in the estimate of any feature that touches the affected code. The improvement then pays off immediately, in the very work that needed it.
- Make debt visible in the WBS. Keep a branch for technical debt with sized items, ranked like everything else. A cost that has a size and a place in the plan can be discussed, and one that is only a complaint cannot.
10. How do you add a buffer without padding every task?
The problem. Everyone adds a little safety to their own estimate. The padding is invisible, it gets used up by Parkinson's law, and the project is still late when a real risk arrives.
- Use one project buffer. Estimate tasks at a realistic, not a safe, value and collect the safety into one buffer at the end of the critical path. The buffer is visible, shared and consumed only by real delays.
- Keep a risk register. List the specific things that could go wrong, with a probability and a cost each. Add contingency tasks only for the risks that matter, so the reserve is tied to a reason.
- Commit to a range. Use three-point estimates to produce a range and promise a date you can hit with, say, 80 percent confidence. The difference between the likely date and the promised one is your buffer.
11. How do you plan when the requirements are unclear?
The problem. The customer knows what they want only in broad terms, but the plan and the price are needed now. Any detailed estimate is built on assumptions nobody has written down.
- Write the assumptions down. List every assumption the estimate depends on next to the plan. When one of them turns out to be wrong, it is clear which part of the plan has to change and why.
- Run a paid discovery phase. Plan and price a short phase of workshops, prototypes and analysis first. The estimate for the build is made at the end of it, on requirements that actually exist.
- Plan in waves. Commit firmly only to what is clear today and keep the rest as larger blocks with wide estimates. Narrow them down as the requirements become concrete.
12. How do you turn an estimate into a budget?
The problem. Man-days are not money. Different people cost different amounts, and a budget built only from labor forgets licenses, infrastructure and everything else that is paid for in cash.
- Price each task at its owner's rate. Multiply the days of every leaf by the rate of the person or role assigned to it and let the branches add up. A senior architect and a junior developer on the same branch are no longer averaged into one number.
- Add the costs that are not people. Add separate lines for licenses, cloud infrastructure, hardware, travel and external services. They are easy to forget and hard to explain later.
- Show a range, not a figure. Turn the optimistic and pessimistic estimates into a low and a high budget. A sponsor who sees the range from the start is not surprised when the result lands inside it.
13. How do you plan around holidays, freezes and availability?
The problem. A plan that assumes five working days a week for everyone, all year, is wrong from the start. Holidays, vacations, code freezes and people shared with other projects all take time away.
- Schedule in working days. Count durations in working days and skip weekends and public holidays. A ten-day task started on a Thursday then finishes when it really will.
- Mark freezes and milestones on the chart. Put code freezes, release windows and key dates on the timeline itself. Work that would land inside a freeze is visible before it happens, not after.
- Plan with a focus factor. Assume each person spends only part of the day on the project, often 60 to 80 percent, because of meetings, support and other work. Reduce it further for anyone shared between teams.
14. How do you plan the migration of a legacy system?
The problem. Nobody knows everything the old system does. The features that are missing from the plan are found in production, after the old system has already been switched off.
- Inventory the old system as a WBS. Before planning the new system, break the old one down into everything it does today, including reports, batch jobs and integrations. That tree is the scope the migration has to cover.
- Migrate piece by piece. Replace the old system one function at a time and route traffic to the new part as it is ready, the strangler fig pattern. Each step is small, testable and reversible.
- Rehearse the data migration. Plan several full trial runs of the data migration on a copy of production. Each rehearsal shortens the real switchover and finds the data that does not fit.
15. How do you estimate a project built fully agentically by AI?
The problem. When AI agents write most of the code, man-days of coding stop meaning much. An agent can produce a feature in minutes, yet the project still takes weeks, because the time moves to writing specifications, reviewing output, fixing what the agent got wrong and paying for every run. An estimate built the old way counts the wrong work.
- Estimate the human work, not the typing. Split every leaf into specify, review and verify, and size the hours a person spends on each. Writing a precise spec, reading the agent's changes and testing them is where the time goes now, so that is what the WBS should measure.
- Make tokens a budget line. Estimate how many agent runs each task needs and what a run costs on the model you use, then add it as its own line beside labor. Leave headroom for retries, because a task that takes three attempts costs three times as much.
- Calibrate on a pilot. Run a handful of representative tasks through the agents first and measure attempts, review time and rework for each. Apply those ratios to the rest of the plan, and keep a buffer for the work agents still struggle with, such as new architecture and tricky integrations, which falls back to people.